Introducing, defining, and explaining both the processes and histories behind Integrated Resource Plans in Louisiana.
By Daniel Lovett, AAE Economic Analyst Intern
|
“A type of utility planning process that develops long-range resource plans by seeking the optimal combination of resources (including demand, supply-side, and possibly other options) to meet forecasted load requirements at the lowest reasonable total cost, subject to various objectives and constraints, including but not limited to reliability, planning, regulatory, environmental and operational requirements”. (2)
|
IRP Process
The process of identifying an action plan includes first, determining a “Resource Acquisition Plan”, which refers to the combination of resources that are most affordable, reliable, as well as environmentally and governmentally sustainable. Once this has been established, it is paired with a specific “Future”, which refers to the future macroeconomic environment that the company believes is most likely to occur. The “Future” is determined using primarily subjective, qualitative predictions about the nature of the economy, environment, and government regulation in regards to both the energy sector and the overall economy as it relates to its demand for energy. The pairing of the Resource Acquisition Plan and a Future forms a “Portfolio” which constitutes the company's direction going forward for the next 20 years. Some best practices to follow throughout this process, as defined by the IRP subcommittee of South Carolina, can be found in the list below. (5)
- IRP’s should analyze multiple portfolios that include both demand side and supply side resources.
- IRP’s should include portfolios which contain numerous types of Demand Side Management (DSM) options such as education, energy usage reduction, or energy efficiency measures.
- IRP’s should explore possible uncertainties and sensitivities regarding fuel prices and technology costs and include these in their plans.
- IRP’s must list the expected retirement date for each unit planned to retire within the 15-year IRP analysis period.
- IRP’s should present both economic and environmental metrics in relation to base plan across all scenarios in their proposal.
- IRP’s should select one plan and discuss this plan in reference to relevant economic and regulatory factors.
- IRP’s should provide the following analysis input assumptions for each year of the analysis including for all years beyond the 15-year planning period.
IRP History in Louisiana
Today, Louisiana is one of 33 states which requires its energy companies to file a publically available IRP, typically planned for 15-20 years into the future, and updated every two or three years (6). States without such existing guidelines are mostly moving towards them or have a similar process that ensures energy accountability and transparency. Such requirements began to emerge in the US in the 1980’s as a way to increase resource diversity, reduce reliance on foreign oil, and integrate both supply side and demand side management tactics into the plans of energy companies. In Louisiana, the earliest recorded governmental guideline regarding IRP’s dates to 2007, when rules defining and requiring an Integrated Resource Planning process were established as a result of regulator’s desires to stay informed and engaged during the energy planning process (7).
Before these statewide requirements were established, the city of New Orleans implemented “Least Cost Planning”, requirements in 1991 (8), which were similarly designed to compel utility companies to be more transparent with their energy plans. In Louisiana, IRP proceedings are initiated when a utility files a ‘draft IRP’, the proceeding continues for approximately a year, including multiple rounds of feedback from stakeholders in the form of written comments. Following the LPSC’s 2007 guidelines, Entergy Louisiana LLC. (ELL) filed its first IRP in 2012, updating it in 2015, and most recently again in 2018. Entergy New Orleans (ENO), conducted its first IRP in 2008 (Docket UD-08-02) and has updated it in 2012, 2015, and 2018.
View the current IRP documents UD-17-03
Where: New Orleans City Hall (1300 Perdido St.)
When: Friday, August 9th, 2019 1-3 pm
What: Come learn about Entergy's Integrated Resource Plan (IRP) – the Key to Long-term Energy Efficiency. This is the planning process by which Entergy estimates its future power supply needs and assesses the resources available to it to meet those needs.
ENO will present its report to the public and hear public comment regarding it. This is your opportunity to let your voice be heard!
Get Entergy's Public Meeting Materials
Citations
- https://www.rockymountainpower.net/about/irp.html
- www.entergy-louisiana.com/userfiles/content/irp/LPSC_General_Order_R30021.pdf Page 3-4, Docket ,Vo. R-500.21
- http://www.pacificorp.com/es/dsm.html
- https://business.directenergy.com/understanding-energy/what-is-supply-side-energy-management
- https://docs.google.com/document/d/10gDsaBE-5ggnWP33n-hRJKr4osIxyctq-VyO1HvXzH8/edit
- https://blog.aee.net/understanding-irps-how-utilities-plan-for-the-future
- https://www.entergy-louisiana.com/userfiles/content/irp/LPSC_General_Order_R30021.pdf
- https://library.municode.com/la/new_orleans/munidocs/munidocs?nodeId=M7141994-10-20PDF
Sources
“In re: Development and Implementation of Rule for Integrated Resource Planning for Electric Utilities,” Docket No. R-30021-LPSC, 2012, https://www.entergy-louisiana.com/userfiles/content/irp/LPSC_General_Order_R30021.pdf
“Integrated Resource Plan,” Rocky Mountain Power, https://www.rockymountainpower.net/about/irp.html
“Energy in Action: IRP Guidelines”, Energy.Sc.Gov/EnergyPlan, https://www.entergy-louisiana.com/userfiles/content/irp/LPSC_General_Order_R30021.pdf
Girouard, Coley. “Understanding IRP’s: How Utilities Plan for the Future,” Advanced Energy Economy, Aug. 2015. https://blog.aee.net/understanding-irps-how-utilities-plan-for-the-future
“Of Regular Meeting of the Council of the City of New Orleans Helf in the Council Chamber,” New Orleans City Hall, Oct. 1994, https://library.municode.com/la/new_orleans/munidocs/munidocs?nodeId=M7141994-10-20PDF
“What is Supply Side Energy Management?” Direct Energy Management, https://business.directenergy.com/understanding-energy/what-is-supply-side-energy-management
Leave a Reply.
Archives
September 2023
August 2023
July 2023
June 2023
May 2023
April 2023
March 2023
February 2023
December 2022
November 2022
October 2022
September 2022
August 2022
July 2022
June 2022
May 2022
April 2022
March 2022
February 2022
January 2022
December 2021
November 2021
October 2021
September 2021
August 2021
July 2021
June 2021
May 2021
April 2021
March 2021
February 2021
January 2021
December 2020
October 2020
August 2020
July 2020
June 2020
May 2020
April 2020
March 2020
February 2020
January 2020
December 2019
November 2019
October 2019
August 2019
July 2019
June 2019
April 2019
March 2019
February 2019
January 2019
December 2018
October 2018
August 2018
July 2018
June 2018
May 2018
April 2018
March 2018
January 2018
December 2017
November 2017
October 2017
September 2017
August 2017
July 2017
May 2017
March 2017
February 2017
January 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
March 2015
February 2015
December 2014
October 2014
September 2014
August 2014
July 2014
June 2014
May 2014
April 2014
March 2014
January 2014
November 2013
October 2013
September 2013
August 2013
July 2013
June 2013
May 2013
April 2013
March 2013
February 2013
January 2013
November 2012
October 2012
September 2012
August 2012
July 2012
June 2012
May 2012
April 2012
March 2012
February 2012
January 2012
Categories
All
Air Quality
Alexandria Lia
ALI
ALI Meiner
Andrew Wiseman
Anniversary
Bia Assevero
Bills
CalGreen
CCS
Charles Rice
Clean Energy
CLECO
CLECO FAQ
CLECO Sale
CLECO Sale Denied
CLECO Stock
CLECO Stock Prices
CLECO Takeover
Climate Change
Clyde Holloway
CO2
Coastal Restoration
Corruption
Cost
David Roberts
Decoupling
Deregulation
Dirty Energy
Economics & Billing
Education
Elections
Electric Vehicles
Energy
Energy Efficiency
Energy Policy
Energy Smart
Entergy
Entergy New Orleans
Environmental Justice
Environmental Risks
EPA
False Solutions
FERC
Gas Plant
Georgetown
Government
Grand Gulf
Green Building
Grid Failure
Grid Hardening
GSREIA
Gulf Of Mexico
Health Risks
Housing
Hurricane
Hurricane Sandy
Hydrogen
Industrials
Infrastructure
IRP
Land Loss
Land-Use
LA Public Service Commission
LDEQ
LEED
Legislative Session
Legislature
Liquid Air
Louisiana
Louisiana Public Service Commission
LPSC
MACQUAIRE
Mayor's Office
Microgrids
MISO
Natural Gas
New Iberia
New Orleans City Council
News
NRDC
Nuclear
Oil & Gas Leases
People Power
Permitting
Pipelines
Power Grid
Power Outages
Power Plant
Public Interest
Rate Case
Regulation
Reliability
Renewable Energy
RENEWABLE ENERGY POLICY NETWORK FOR THE 21ST CENTURY
Resiliency
Resolutions
RTO
Rulemaking
Sacrifice Zones
Sea Level Rise
Solar
Storage Solutions
Storm Costs
Subsidies
SWEPCO
TED Talks
The Town Walk
Town Hall Meetings
Transmission
Utilities
Vicki Arroyo
Watchdog
Water Conservation
Water Use
WDSU
Wetlands
Wind Energy
WWL Radio