UD-17-03

IRP (2018)

2018 Triennial IRP of Entergy New Orleans

​2018 Triennial Integrated Resource Plan of Entergy New Orleans, Inc. This is Entergy’s public planning process by which they assess New Orleans’ projected power supply needs for the next 20 years and then model the most cost effective energy solutions.

The Integrated Resource Planning (IRP) process is a powerful tool for ensuring that New Orleans energy consumers receive affordable and reliable electricity service that does not compromise the health of their communities or the environment. Entergy’s IRP will be the basis for all their major power generation and energy efficiency investment decisions.

Read More

Entergy New Orleans is required to conduct integrated resource planning every 3 years. During the IRP process a utility will model different resources to determine the mix of demand-side (such as energy efficiency, weatherization, energy storage) and supply-side (such as the construction of a fossil fuel-fired generating plant or solar farm) technologies that it will use to economically and efficiently meet its user demand. The IRP process encompasses all aspects of the utility planning process, from generation to transmission and distribution.

Put more simply, the IRP process takes into account estimates of customers’ future electricity needs and the least cost resources available to serve those needs. Does your utility want to retire costly, and dirty coal generation in favor of renewables, or do they want to build a new gas plant? Another important piece to check here is how your utility is modeling energy efficiency.

Regulators must ensure that Entergy’s modeling of the energy future reflects real-world conditions. Legacy coal- and natural gas-fired generation units are retiring at an accelerating rate, often years before past predictions. Meanwhile, energy efficiency and renewable energy continue to outpace large-scale fossil fuel generation in terms of cost-efficiency.

The Alliance is intervening in Entergy’s Triennial IRP to ensure that the needs and interests of communities across New Orleans are represented and protected. We are advocating for the most cost effective energy solutions: energy efficiency and other demand side solutions. We are also watching to ensure clean and renewable energy is being modeled on a fair playing field against the utility’s preferred fossil fueled plants.

OPTIMAL ENERGY, INC
Optimal Energy, Inc was contracted by the City Council of New Orleans – for an 11 month period beginning February 1st, 2018 – to provide an independent Demand Side Management (DSM) Potential Study. The DSM Study was indented to give the Council greater confidence in the assessment of achievable DSM potential in the City and to ensure and maintain the continuity of the 2018 Triennial Integrated Resouce Plan (IRP).

For more information on the proposed scope of work and project schedule see Exhibit A of the Optimal DSM contract.

City Council of New Orleans (CNO)

2019 11 07 UD-17-03 CURO Updated Service List

2019 09 30 UD-17-03 CNO Updated Service List

2019 09 09 UD-17-03 CURO Notice of 3rd Public Meeting IRP

2019 07 18 UD-17-03 CNO Service List

2019 07 02 UD-17-03 CNO Updated Service List

2019 07 02 UD-17-03 CNO Notice of Second Public Meeting

2019 03 29 UD-17-03 CNO Updated Service List

2018 10 05 UD-17-03 CNO Updated Service List

2018 10 04 UD-17-03 CNO Updated Service List

2018 08 10 UD-17-03 CNO Rate Design Results Summary

2018 08 10 UD-17-03 CNO ACEEE NOLA DR Draft Results

2018 07 12 UD-17-03 CNO Optimal PPT-NOLA Draft Results

2018 06 12 UD-17-03 CNO Service List

2018 04 19 UD-17-03 CNO Amending Initiating R-18-135

2018 04 18 UD-17-03 CNO Updated Service List

2018 04 06 UD-17-03 CNO Updated Service List

2018 04 04 UD-17-03 CNO Updated Service List

2018 04 04 UD-17-03 CNO Notice of DSM Potential Study Kickoff Meeting

2018 04 04 UD-17-03 CNO DSM Potential Study Kickoff Meeting Revised Agenda​

2018 04 04 UD-17-03 CNO DSM Potential Study Kickoff Meeting Agenda

2018 03 29 UD-17-03 CNO Optimal Entergy DSM Potential Study Draft Measures List

2018 03 26 UD-17-03 CNO Order Granting AEMA Intervention

2018 03 26 UD-17-03 CNO Order Extended Procedural Schedule

2018 03 19 UD-17-03 CNO Updated Service List

2018 03 12 UD-17-03 CNO Updated Service List

2018 01 08 UD-17-03 CNO Notice of IRP Technical Meeting #1

2017 09 14 CNO Motion M-17-480 DSM Potential Study for the Council in the 2018 IRP

2017 08 10 UD-17-03 CNO R-17-430 Initiating Resolution Re- ENO 2018 Triennial IRP

2017 07 26 UD-17-03 CNO Resolution R-17-409 in re: ENO’s 2018 Trienial Integrated Resource Plan

Entergy New Orleans, LLC (ENO)

2024 03 06 UD-20-02, UD-17-03 & UD-08-02 ENO Energy Smart Memo Re. Code Compliance & Income Qualified Retail Lighting Program

​2023 11 21 UD-20-02, UD-17-03 & UD-08-02 ENO Energy Smart PY13 Technical Reference Manual V7.0

2023 10 12 UD-17-03 & UD-08-02 ENO Energy Smart PY13 Midyear Report

2023 09 07 UD-17-03 & UD-08-02 ENO Energy Smart PY12 Lost Contribution to Fixed Costs & Utility Performance Incentive Calculations

2023 01 11 UD-17-03 & UD-08-02 ENO MEMO Re. Energy Smart PY12 TRM V6.1 (Inventory Changes)

2023 01 10 UD-17-03 & UD-08-02 ENO Energy Smart PY12 TRM V6.1 (Volume III)

2023 01 10 UD-17-03 & UD-08-02 ENO Energy Smart PY12 TRM V6.1 (Volume II)

2023 01 10 UD-17-03 & UD-08-02 ENO Energy Smart PY12 TRM V6.1 (Volume I)

2022 11 21 UD-20-02, UD-17-03 & UD-08-02 ENO Technical Reference Manual V6.0

2022 10 14 UD-08-02 & UD-20-02 ENO Reply Comments Re. Energy Smart PY13-15 Implementation Plan

2022 06 30 UD-17-03 & UD-08-02 ENO Energy Smart PY11 Annual Report & Evaluation, Measurement, & Verification Report Cover Letter

2022 06 30 UD-17-03 & UD-08-02 ENO PY11 Energy Smart Lost Contribution to Fixed Costs (LCFC) & Utility Performance Incentive (UPI)

2022 03 09 UD-17-03 & UD-08-02 ENO Application for Battery Storage Demand Response (DR) Pilot Program for Energy Smart PY12

2021 11 22 UD-17-03 & UD-08-02 ENO Energy Smart TRM Version 5.0

2021 10 12 UD-17-03 & UD-08-02 ENO Energy Smart PY11 Midyear Report (Corrected)

2021 10 01 UD-17-03 & UD-08-02 ENO Energy Smart PY11 Midyear Report

2021 06 30 UD-17-03 & UD-08-02 ENO PY10 UPI & LCFC Filing

2021 05 03 UD-17-03 & UD-08-02 ENO Energy Smart PY10 Arrears & Disconnects Study

2021 05 03 UD-17-03 & UD-08-02 ENO EM&V Rpt PY10 (Final)

2021 05 03 UD-17-03 & UD-08-02 ENO Energy Smart Rpt PY10 (Final)

2021 05 03 UD-17-03 & UD-08-02 ENO EM&V & Energy Smart Report PY10 CL

2021 04 30 UD-17-03 & UD-08-02 ENO Energy Smart PY11 Quarterly Report

2020 11 03 UD-17-03 & UD-08-02 ENO Energy Smart PY10 Q3 Report

2020 07 31 UD-17-03 & UD-08-02 ENO EM&V PY9 Rpt

2020 07 31 UD-17-03 & UD-08-02 ENO Energy Smart PY9 Annual Rpt (FINAL)

2020 07 30 UD-17-03 & UD-08-02 & ENO Energy Smart PY10 2nd Quarter Rpt

2020 06 30 UD-17-03 & UD-08-02 ENO Letter for PY9 LCFC & UPI Filing

2020 03 23 UD-17-03 ENO Comments Re ADV’s Proposals

2020 01 31 UD-17-03 & UD-08-02 ENO Energy Smart PY9 Quarter 4 Report

2020 01 24 UD-17-03 & UD-08-02 ENO Corrected Energy Smart Revised Implementation Plan PY10-12

2020 01 22 UD-17-03 & UD-08-02 ENO Energy Smart Revised Implementation Plan PY10-12

2020 01 21 UD-17-03 ENO Reply Comm Concerning 2018 IRP

2020 01 15 UD-17-03 & UD-08-02 ENO Energy Smart Program Ext PY9 Implementation Plan

2019 12 09 UD-17-03 ENO App for Approval of Implementation Plan PY 10-12

2019 12 02 UD-17-03 ENO 2018 IRP Appendix A Rules Compliance Matrix

2019 11 22 UD-17-03 ENO Revised Energy Smart PY10-12 DR Tech Meeting #6 (FINAL)

2019 10 30 UD-17-03 & UD-08-02 ENO Energy Smart Quarterly Report for 7/1/19 to 9/30/19

2019 10 29 UD-17-03 & UD-08-02 ENO Energy Smart Energy Effic PY10-12 Scenarios

2019 10 29 UD-17-03 ENO Reply Comments Concerning 2018 IRP

2019 10 21 UD-17-03 & UD-08-02 ENO Tech Ref Manual V3.0

2019 07 19 UD-17-03 ENO 2018 Integrated Resource Plan Report

2019 06 27 UD-08-02 and UD-17-03 ENO Calculation of Lost Contribution to Fixed Cost and Utility Performance Incentive to PY8 Energy Smart

2019 05 01 UD-08-02 and UD-17-03 ENO Energy Smart Annual Program Report 2018

2019 03 07 UD-17-03 ENO Withdrawal Revised Supplemental & Amended Implementation Plan

2019 03 07 UD-08-02 & UD-17-03 ENO App for Approval of Revised Supp & Amended Plan for PY9 of Energy Smart

2018 11 14 UD-08-02 & UD17-03 ENO App for Approval of the Revised Supplemental and Amended Implementation Plan for PY 9 of the Energy Smart Plan and Exhibits

2018 11 14 UD-08-02 & UD-17-03 ENO’s Revised PY 8 Implementation Plan

2018 10 30 UD-08-02 & UD-17-03 ENO PY8 Quarter Report

2018 10 17 UD-17-03 ENO Tech. Meeting 2 Follow Up Re

2018 10 17 UD-17-03 ENO Solar ENOI Workpaper

2018 10 11 UD-08-02 & UD-17-03 ENO NOLA Technical Reference Manual Version 2.0 Stamped CV

2018 10 11 UD-08-02 & UD-17-03 ENO NOLA Technical Reference Manual Version 2.0​

2018 08 31 UD-17-03 ENO DSM Potential Study

2018 08 07 UD-17-03 ENO Revised Calculation of LCFC and UPI re. PY 5&6 of Energy Smart

2018 07 23 UD-08-02 and UD-17-03 ENO Comments Re. Reduction of Peak Demand

2018 07 18 UD-08-02 and UD-17-03 ENO’s Energy Smart Program Behavioral Pilot EM&V Report Filing

2018 06 29 UD-08-02; UD-17-03 ENO Letter for PY 7 LCFC

2018 05 30 UD-08-02 & UD-17-03 ENO’s Energy Smart PY 7 Annual Program Report, and Annual Evaluation, Measurement and Verification Report

2018 02 19 UD-17-03 ENO LTR to K. Hamilton Re. AEMA Petition

2017 09 11 UD-17-03 ENO’s Presentation for IRP Kickoff (9/25/2017)

2017 08 22 UD-17-03 ENO Reply to AAE Concerning Independent DSM Potential Study

Requests for Information (RFI)

Advisors to the City Council (ADV)

Advisors 1st Set

Advisors 2nd Set

Advisors 3rd set

Advisors 4th set

Requests for Qualifications (RFQ)

Advisors' Response to AAE's 2nd RFQ